Geotech Hazard Assessment Report - Amended Draft - Executive Summary EBA considers the property can be safely developed for proposed residential and equestrian uses... |
| Dec 4, 2010 |
Hydro Hazard Assessment Report - Draft - Executive Summary Report Conclusion: LaCas Consultants Inc. has determined the land use meets acceptable criteria and land may be used safely for the use intended, provided that properly designed flood and erosion mitigation works are in place to provide protection from the 500-yr design flood of the Cheakamus River. |
| Aug 9, 2010 |
Geotech Hazard Assessment Report - Draft - Executive Summary Report Conclusion: EBA Engineering Consultants Ltd. have determined that the land use meets acceptable criteria and that it may be used safely the use intended. EBA recommends the construction of a dyke to mitigate abnormal flooding resulting from indirect impacts due to debris-laden floods. |