Hydro Hazard Assessment Report - Draft - Executive Summary

Dec 4, 2010: Report Conclusion: LaCas Consultants Inc. has determined the land use meets acceptable criteria and land may be used safely for the use intended, provided that properly designed flood and erosion mitigation works are in place to provide protection from the 500-yr design flood of the Cheakamus River.

AttachmentSize
Hydro Hazard Assessment Report Executive Summary.pdf915.01 KB